Facts and Figures

Borkum wind farm data

Location Southern part of German Bight, north of 54 degrees latitude
Distance from the coast 45 km off the island of Borkum
Water depth 25 to 35 metres
Number of wind turbines up to 80 in total, 40 in the first installation phase
Total output 400 MW (200 MW in the first installation phase)
Power generated per year 750 GWh
Full utilisation hours 3,500 to 4,000 per year
Space requirement 56 km2
Investment volume over EUR 1 billion in the first installation phase (already including infrastructure costs for the second phase)
Service life 25 years
Start of construction Summer 2011 (resolution passed on 15 December 2010)
Scheduled commissioning Q4 2014
Partners for the first installation phase 33 municipal utility companies + Trianel

Technical wind turbine data

Wind turbine type Areva Wind M5000
Net output 5 MW
Total height above water 148 m
Total height above seabed 178 m
Height of hub 90m
Rotor diameter 116 m
Rotor area > 10,000 m2
Total weight > 1000 t
Rotor weight 110 t
Nacelle weight 200 t
Nacelle weight with rotor and hub 310 t
Base structure Tripod
Tripod weight 700 t
Tripod height 45 m
Length of piles (Tripod) 35 to 45 m

Wind turbine operating data

Nominal output 5,000 kW
Cut-in wind speed 3,5 m/s (wind force 3)
Nominal wind speed 12,5 m/s (wind force 6)
Cut-out wind speed 25 m/s (wind force 10)
Revolutions 5.9 to 14.8 rpm
Blade tip speed 90 m/s (324 km/h)